Sunday, August 26, 2007

The House that L J Zima Built


Not – Finished
Basement door
Goo-Gone Bathtub
Concrete patch
Sell House, LISTED with realtor as of 8/27/2007

Finished – all the rest of the stuff we were doing.

Thursday, August 9, 2007

Finished / Not-finished

Finished:
1. Carpet
2. Seat in the bathroom
3. Caulking the tub
4. Painted 1 closet
5. Floor in bathroom
6. Fix the front door

Not-Finished
1. Concrete
2. Front flower garden
3. Get Survey of property
4. Sell the house. Was offered $70,000, but I said $110,000. No response as yet.

Keep the faith and keep praying!

Wednesday, August 8, 2007

How we spent our anniversary, 8-8-07

Well first we were awakened by a call from the carpet layers saying that they would be at Dad’s in ½ hour. Then we got online &/or phone and ordered our own presents. Pop got router bits and set ups and I choose a slicer, a bread maker and a dehydrator, instead of the NIKON camera that pop wanted me to have.

Then we grabbed some chow and went across the street to the Zima house. Pop ran heard on the two carpet layers while I picked blue berries and peaches. Then, I went to Home D to get a toilet seat for the Zima house and chew out the manager for not following through on help with the deck. Following a hair cut, grocery shopping, and a bank visit, we mowed our and Dad’s lawns.

I picked beans and visited with the baby rabbits that are living IN the garden. They said HI, but would no longer let me pet them showing their true wild nature.

Finally, we cooked steak & potatoes and ate them with beans and cucumbers from the garden. We finished off the evening with some TV watching (Holmes on Homes) and went to bed.

And so ends another fantastic anniversary!(Smiles) It ranks right up there with the Alaska trip from last year. ~~~I don’t think so!

God Bless.

Friday, August 3, 2007

Not Finished

NOT FINISHED

1. Carpet -- Back Ordered
2. Fix Sidewalk
3. Paint two closets
4. Fix front door
5. Sell house

Pax & Love, Babka

Thursday, August 2, 2007

Finished

Newly FINISHED at Zima Home.
1. Wiring
2. Painting
3. Papering

Love, Babka